Construction of Hall 4
For expanding by 30% of its production areas the DeBulCo OOD company has started a new construction. The newly built hall has a built-5T crane for easier manipulation of of raw materials supplies. The building consists of a basic hall with dimensions 22 x 42 m and additional building for the boiler room to it, constructed on the principle of steel supporting construction. There were used wall and roof panels RUUKKI with the best heat insulating characteristics – with mineral wool 120 mm.